Design of Highway Alignment tunnel for the The Central Artery/Tunnel Project (Big Dig) at Atlantic Avenue
Design of Highway Alignment tunnel for the The Central Artery/Tunnel Project (Big Dig) at Atlantic Avenue
Concept design for Integrated transportation system within Palm Deiraand road network connecting the existing main land of Dubai.
Proposed Junction design maintaining the traffic movements in Croydon -Wellesley Road/George Streetwhich improves the conditions for pedestrians and cyclists
Highway engineering design for the Mall of the World site in Jumeirah. By designing SZR Interchange/Umn SuqueimmRd., the site obtains additional entry/exit access points for recreation and commercial purposes on prime land.
Highway engineering design for the proposed runways affecting the exiting road network, local palace and Al Reef Villas Development. A total of 5 Interchanges, 15 kilometres of highway, 3 kilometres of Tunnel is necessary to maintain the existing road network.
1. Nested spiral lanes, eliminated lane changing on the circulatory – reduce number of conflict points.
2. Equal lane utilization, protected exit maneuvers.
3. Nested spiral lanes and perpendicular approaches – Minimized footprint.
Highway engineering design for realignment of the existing Corniche road. By designing this principal road, the city obtains additional area for recreation and commercial purposes on prime land.
Transportation Planning to expand the existing road network for Abu Dhabi Ports Company, that comprises of 3 kilometers of underground tunnel, bridges and at grade junctions.
Highway engineering design for realignment of the existing Corniche road. By designing this principal road, the city obtains additional area for recreation and commercial purposes on prime land.